Service
Full Kitchen Remodels in Parksville & Oceanside
Oceanside Kitchen Studio takes on full kitchen remodels across Parksville and Qualicum Beach. We handle design, demolition, cabinets, counters, plumbing, electrical, tile and appliance install with one in-house team, on a fixed written quote.
What's included
A full remodel replaces every visible surface and usually reworks the layout. We handle the design, pull the building permit where one is needed, and run demolition, framing changes, electrical and plumbing rough-in, cabinets, stone, tile, lighting and appliance installation as one coordinated build. You deal with us, not with five separate trades.
- Demolition and disposal of your existing kitchen
- Structural, electrical and plumbing rough-in, permits pulled and inspected
- Custom or semi-custom cabinetry with soft-close hardware
- Quartz, stone or butcher-block countertops
- Tile backsplash, flooring, lighting and appliance install
- Final finish and punch list completion
What it costs
What does a kitchen renovation cost in Oceanside?
These are the ranges we quote, and they move with the scope of the work, so treat them as a starting point rather than a quote. We give you a fixed written quote once we've seen the space.
- Cosmetic refresh — cabinet refacing, new counters, hardware, paint$15,000–$30,000
- Mid-range full renovation — new cabinets, counters, flooring, lighting, minor layout changes$30,000–$70,000
- High-end / custom or structural — walls moved, custom cabinetry, premium finishes$70,000 and up
Typical timeline: design a few weeks; on-site 4–8 weeks for a standard kitchen (10–12+ weeks with custom cabinetry or structural work). See the full 2026 cost breakdown.
How the process runs
- 01
Consultation
We come to your home for about an hour, walk the space with you and leave you with a realistic budget range. The visit is free.
- 02
Design
Our designer works through layout, cabinetry, finishes and lighting before a single tool comes out. You approve the 3D renderings and the material list before we start building.
- 03
Build
Our own crew works to a week-by-week schedule, cleans up at the end of every day, and books the inspections.
- 04
Handover
We walk the finished kitchen with you, close out the punch list, and hand over your final documentation.
Building on this coast
What does salt air change about the spec?
We spec hardware and finishes for salt air, and we seal the cabinet boxes on all faces. Where the work is structural, or moves a drain line or a circuit, your kitchen needs a permit — we pull it and meet the inspector.
Common questions
What homeowners ask us most.
How long does a full kitchen remodel take?
Most full kitchens take 4–8 weeks on site, after 3–5 weeks of design and ordering. We give you a week-by-week schedule.
Do I need a permit for a full kitchen remodel?
If we move a wall, a drain or a circuit, you need a permit, and we pull it and book the inspections.
What does a full remodel cost?
Most full kitchen remodels we quote land between $30,000 and $70,000. Custom cabinetry, a moved wall or high-end appliances and stone push a kitchen past $70,000. We give you the exact number in writing after the in-home visit.
Book your consultation
Let's talk about your kitchen.
Three quick questions is all it takes. We'll come back to you within 24 hours and book a free visit at your home in Parksville.